Back to Projects




Kangaroo Ground dam repair
Full dam rehabilitation—de-silting, embankment repair, and spillway upgrades for a Kangaroo Ground farm dam.





This Kangaroo Ground property had an ageing farm dam that had lost capacity and was showing signs of wear. Sediment had built up over the years, reducing water storage. The embankment needed reshaping and compaction, and the spillway required upgrades to handle heavy rainfall safely.
We brought in our excavators and bulldozers to tackle the job properly. First, we drained the dam and removed the accumulated silt and sediment—restoring the basin to its original depth and water-holding capacity. Our excavator worked the basin and banks while the dozer shaped and compacted the embankment, addressing erosion and ensuring a stable structure.
We reshaped the dam walls with correct slopes, upgraded the spillway to manage overflow during wet weather, and compacted the earth to minimise seepage. The result is a dam that holds more water, is structurally sound, and will perform reliably for years to come.
Farm dam repair is one of our core specialties. When you need de-silting, embankment stabilisation, or a full rehabilitation, we bring the right equipment and decades of experience to get it done right.

